Do I need planning permission for a kitchen extension?
Often not. A single-storey rear kitchen extension in England is usually permitted development if it is no deeper than 3m from the original rear wall (4m for a detached house), no higher…
Most popular
Planning answers
Short, sourced answers for homeowners in England, checked on 24 November 2026. Each one links to the official source.
Often not. A single-storey rear kitchen extension in England is usually permitted development if it is no deeper than 3m from the original rear wall (4m for a detached house), no higher…
Usually not. In England a loft conversion is normally permitted development if the extra roof space is no more than 40 cubic metres for a terraced house or 50 cubic metres for a…
Usually not. The Planning Portal says planning permission is not usually required for a garage conversion, provided the work is internal and does not enlarge the building. Check first…
Usually not, if the new doors or windows are similar in appearance to those already used on the house. New bay windows count as extensions, side-facing upper-floor windows must be…
Most planning applications in England are decided within 8 weeks. Unusually large or complex applications have a 13-week target. The clock usually starts when the council validates your…
In England, from 1 April 2026, a householder planning application (extensions and alterations to one house) costs £548. A lawful development certificate for a proposed project costs half…
Usually, yes. Nationwide's October 2025 House Price Index estimated that an additional double bedroom (about 13m²) can add 13% to the value of a two-bedroom house, and that a loft…
Read the reasons on the decision notice, then either change the design and submit a new application, or appeal to the Planning Inspectorate. For a householder application you can appeal for…