Planning permission granted: what happens next?

Congratulations: your planning application has been approved. Here are the steps most homeowners in England go through between approval and the first day on site.
1. Read your decision notice carefully
Your approval will list conditions. Some must be dealt with before work starts (pre-commencement conditions), such as approving materials samples. Starting work without discharging them can put your permission at risk.
2. Note the time limit
Most planning permissions must be started within three years of the decision date, unless your notice says otherwise.
3. Get Building Regulations approval
Planning permission and Building Regulations are separate. You can use your council's building control service or an approved inspector. You will usually need technical drawings and structural calculations.
4. Check the Party Wall Act
If you build on or near a shared wall or boundary, or dig foundations close to a neighbour's, the Party Wall etc. Act 1996 may require written notice, typically one or two months before work starts depending on the work.
5. Get comparable quotes
Send the same drawings and specification to each builder or specialist, and ask for itemised quotes. Our guide to comparing quotes explains what to look for.
6. Plan the glazing early
Doors, windows and roof glazing often have the longest lead times. Get these quotes alongside the build quote so nothing holds the job up.
This guide is general information about England, not professional advice. Check with your council or a qualified professional for your project.